Applicability
Suitable for
Distributors, project buyers and OEM/ODM enquiries that need a structured RFQ, category selection and a documented approval path.
Not suitable for
Replacing local engineering approval, compliance review, import advice, contract due diligence or evidence for an untested performance claim.
Traceable RFQ facts
| RFQ component | Buyer input | Output | Traceable source / owner |
|---|---|---|---|
| Product family | Wall Rail, Shelf Brackets, Industrial Pipe or Closet Shelving | Correct category and enquiry routing | Current site taxonomy; ZSFER Product Team |
| Product definition | SKU or drawing, revision, dimensions, material and finish | Controlled item description | Buyer drawing and product owner |
| Commercial input | Quantity, destination, target timing and packaging | Quotation scope and open-question list | Buyer RFQ; procurement/content owner |
| Technical input | Installation, substrate, fasteners, load distribution and required tests | Evidence request and approval plan | Buyer specification; named technical reviewer pending |
Method and evidence
The enquiry path starts with an allowlisted product category, preserves selected SKUs where available and sends the recorded requirement to the website’s GoodJob intake bridge. The public evidence used by support is scoped separately from product performance.

Decision rules
If the buyer knows the product family but not the SKU, choose the category-prefilled Quote page because it preserves routing context. Exception: attach a drawing when the requested item is custom.
If the requirement includes a performance number, request the complete test configuration because a catalogue description alone cannot establish project capacity. Exception: a buyer-approved engineering calculation may define the acceptance route.
Limitations
Support content is not engineering approval. Any performance number must identify the specimen or SKU, installation orientation, substrate, fastener type, load distribution, test method and test date. Translation status, WhatsApp delivery and external system availability are operational states and must be verified separately.